Reference Documents
Electronic CADD Resources Disclaimer Agreement
Use of the information contained in this site carries an express consent of this.
Notice of Disclaimer:
The Colorado Department of Transportation (CDOT) is providing the CDOT Information contained on this site for purposes of information only. CDOT and its agents assume no responsibility for any inconsistencies or discrepancies between said electronic files and any available printed Plans and Specifications (collectively "CDOT Information"). CDOT Information may not be final and some modifications are still being considered, as CDOT finalizes the advertisement package for CDOT’s US 160/US 550 Design-Build Construction Project. All warranties and representations of any kind with regard to CDOT Information are disclaimed, including the implied warranties of merchantability and fitness for a particular use. The receiving party of CDOT Information, through implied consent of use, shall hold CDOT, its officers, employees or agents harmless from all damages including, but not limited to, any and all consequential, incidental, special or exemplary damages, even if apprised of the likelihood of such damages occurring stemming from the use of or reliance on the provided CDOT Information. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for use of the CDOT Information rests on the recipient of the CDOT Information, whose signature is contained below.
Other CDOT Projects in Close Proximity to the US 550/160 Connection South Project
- US 160 Dry Creek Passing Lanes Project
- US 160 Elmore's Corner East Project
- US 550 Gap Project
- US 550 Sunnyside Project
2019 Reevaluations
- US 550 South Connection to US 160 Record of Decision Reevaluation Form 1399
- US 550 Environmental Assessment Reevaluation Form 1399 & Attachments
- US 550 Finding of No Significant Impact (May 2019)
- Attachment A – MOD Design Drawings
- Attachment B – Mitigation Commitments
- Attachment C – Correspondence
- Attachment D – Public Meeting
- Attachment E – Historic Report
- Attachment F – MESA w/ Appendices
- Attachment G – Biological Assessment
- Attachment H – Wetland Impact Maps
Environmental Impact Statement Documents
- US 550 Environmental Assessment & Finding Of No Significant Impact
- US 550 at US 160 Supplemental Final Environmental Impact Statement
- US 550 South Connection to US 160 Supplemental Draft Environmental Impact Statement
- US 160 Final Environmental Impact Statement
Record of Decision Documents
- SFEIS Record of Decision 2015 Documents
- Record of Decision US 160 From Durango to Bayfield 2006
US 550-US 160 Connection South Project Documents
- Fact Sheet
- Connection Presentation
- Economic Case Studies
- Info Sheet
US 550/US 160 Plan Sets and Reports
- US 550/160 Connection South Reference Design Cross Sections
- US 550/160 Connection South Reference Design Plans
- Geotechnical Data Report (July 17, 2018)
- Reference Document Data Log
- US 550 Draft Geotechnical Investigation Report
- US 550 FIR Level Plan Set 12 17 2007
- US 550 Draft Drainage Report
- US 550 Connection to US 160 Draft Structural Selection Report
- US 550 Connection to US 160 Draft Drainage Report
- US 550 Connection to US 160 FIR Level Plan Set 07 12 2016
- US 550 MP 8.88-16.56 Safety Assessment Report
You must request access to these files by completing the form below. By clicking "Submit," your name will be published on our list of requestors.