US 40 Fraser Feasibility Study

About the Project

The project team will study improvements to US 40 between the intersections with County Road 5 and Rendezvous Road. The primary goal of this project is to develop both short- and long-term alternatives and identify Proposed Actions for reducing congestion, improving operational performance and addressing future transportation needs along US 40 between Rendezvous Road and County Road 5 intersections. This project is a joint effort between CDOT, the Town of Fraser, Grand County, and other local entities.

Project Schedule

Study Begins: June 2019

Virtual Public Engagement: July-August, 2020

Shelf Project: September 2020

Project Schedule image

Locations

  1. Widening US 40 to 4 lanes between Eisenhower Drive and Rendezvous Road intersections
  2. Roadway improvements included from Eisenhower Drive to County Road 5 3
  3. Intersection improvements at County Road 5, County Road 8, Eisenhower Drive, Grand Park Drive and Rendezvous Road