US 40 Crack Seal Repair

Project Complete

About the Project:

Work will take place along Colorado Highway 40, from the town of Dinosaur to the town of Massadona, Mile Point 7 to MP 21. Work will be done in both the westbound and eastbound lanes for a 14-mile stretch of US 40.

Project Facts

  • Construction Cost: $437,000
  • Contractor: A-1 Chipseal Company
  • Timeline: October 2024 through November 2024
  • Location: US 40 
    • Nearest Towns: Dinosaur and Massadona
    • Mile Point(s): MP 7 to MP 21
    • County: Moffat

Project Benefits

  • The project will improve and prolong the life of the road surface
  • Crack sealing in a timely manner is one of the most effective ways to maintain the quality and integrity of the road pavement
  • Crack sealing is a very cost-effective, preventive maintenance procedure

Work Schedule:

  • Work will last approximately two months
  • Working hours are 7 a.m. to 5 p.m., Monday through Friday

Traffic Impacts:

  • Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction throughout the duration of the project
  • Lane closures, guided by flaggers and pilot cars, will have up to 15-minute delays
  • The speed limit will be reduced to 45 mph through the work zone
  • Refer to COtrip.org for real-time travel conditions and road closures