US 40 Crack Seal Repair
About the Project:
Work will take place along Colorado Highway 40, from the town of Dinosaur to the town of Massadona, Mile Point 7 to MP 21. Work will be done in both the westbound and eastbound lanes for a 14-mile stretch of US 40.
Work this Week & Lane Closures
US 40 Crack Seal Repair
Project Facts
- Construction Cost: $437,000
- Contractor: A-1 Chipseal Company
- Timeline: October 2024 through November 2024
- Location: US 40
- Nearest Towns: Dinosaur and Massadona
- Mile Point(s): MP 7 to MP 21
- County: Moffat
Project Benefits
- The project will improve and prolong the life of the road surface
- Crack sealing in a timely manner is one of the most effective ways to maintain the quality and integrity of the road pavement
- Crack sealing is a very cost-effective, preventive maintenance procedure
Work Schedule:
- Work will last approximately two months
- Working hours are 7 a.m. to 5 p.m., Monday through Friday
Traffic Impacts:
- Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction throughout the duration of the project
- Lane closures, guided by flaggers and pilot cars, will have up to 15-minute delays
- The speed limit will be reduced to 45 mph through the work zone
- Refer to COtrip.org for real-time travel conditions and road closures