US 385 Realignment and New Structure South of Bristol

About the Project:

The project consists of running concrete pipe under a structure.


Project Benefits

  • The work being done will significantly improve the safety and functionality of the highway.

Work Schedule:

  • Monday through Friday from 7 a.m. to 5 p.m.

 


Traffic Impacts:

  • Within the work zone there will be alternating single lane traffic with a temporary traffic signal as well as shoulder closures.
  • Various other lane and shoulder closures will take place within the work zone with speeds reduced to 40 mph.

Refer to COtrip.org for real-time travel conditions and road closures

Work this Week & Lane Closures
US 385 Realignment and New Structure south of Bristol

Project Facts

  • Cost: $3,775,000
  • Contractor: Tricon 2, LLC
  • Timeline: April 2023 - May 2024
  • Location: US 385 near the intersection with CO 96 
    • Mile Point(s): 96.50 - 99.10
    • County: Prowers