US 385 Realignment and New Structure South of Bristol
About the Project:
The project consists of running concrete pipe under a structure.
Project Benefits
- The work being done will significantly improve the safety and functionality of the highway.
Work Schedule:
- Monday through Friday from 7 a.m. to 5 p.m.
Traffic Impacts:
- Within the work zone there will be alternating single lane traffic with a temporary traffic signal as well as shoulder closures.
- Various other lane and shoulder closures will take place within the work zone with speeds reduced to 40 mph.
Refer to COtrip.org for real-time travel conditions and road closures
Work this Week & Lane Closures
US 385 Realignment and New Structure south of Bristol
Project Facts
- Cost: $3,775,000
- Contractor: Tricon 2, LLC
- Timeline: April 2023 to May 2024
- Location: US 385 near the intersection with CO 96
- Mile Point(s): 96.50 - 99.10
- County: Prowers
![Map of Prowers County identifying work zone at US 385 near CO 86 Map of Prowers County identifying work zone at US 385 near CO 86](https://www.codot.gov/projects/us385bristolrealignment/assets/map-of-prowers-county-identifying-work-zone-at-us-385-near-co-86.png/@@images/9b253dd1-2218-417b-8d06-415afeca4f98.png)