US 287 Resurfacing Northwest of Fort Collins

About the Project

A resurfacing treatment project will occur along US Highway 287 in northeast Colorado. Resurfacing work will take place just northwest of Fort Collins on a one-mile stretch of highway from US 287C to Ted’s Place, Mile Points 354.5 to 355.7.

The resurfacing of the roadway will include:

  • Milling
  • Asphalt overlay
  • Striping
  • Guardrail
  • Signs
  • Delineators

Work this Week & Lane Closures on US 287 Northwest of Fort Collins

Project Facts

  • Construction Cost: $1.75 million
  • Contractor: Martin Marietta Materials, Inc.
  • Timeline: Early May 2025 to end of May 2025
  • Location: US 287 
    • Nearest Town/City: Fort Collins
    • Mile Point(s): MP 354.5 to MP 355.7
    • County: Larimer
Map of the US 287 Resurfacing project northwest of Fort Collins from US 287C (Mile Point 354.5) to Ted's Place (MP 355.7)
Map of the US 287 Resurfacing project northwest of Fort Collins from US 287C (Mile Point 354.5) to Ted's Place (MP 355.7)

Project Benefits

  • The resurfacing treatment will prolong the life of the road surface
  • The project will help repair the rough road and ensure clearer lines and stripes on the roadway
  • The road will have better ride quality and ensure a smoother and safer drive for motorists

Work Schedule

  • Work will last approximately one month
  • Working hours are 7 a.m. to 5 p.m., Monday through Friday

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction throughout the duration of the project
  • Lane closures may have up to 10-minute delays
  • The speed limit will be reduced to 40 MPH through the work zone
  • Refer to COtrip.org for real-time travel conditions and road closures