US 287 & US 50 Resurfacing in Lamar

About the Project:

The Colorado Department of Transportation will begin work to improve a portion of US 287 through Lamar which includes reconstruction of US 287 and a portion of US 50 in Lamar from Park Street to Savage Ave.  


Work Schedule

  • Monday - Friday, 7 a.m. - 5 p.m.

Traffic Impacts

  • Single-lane closures and periodic one-way alternating travel through the work zone.
  • Flaggers and temporary traffic signal will direct single-lane, alternating traffic.
  • Occasional width restrictions of 11 feet will be in place.
  • Occasional Speed reductions will be in place. 

Project Facts

  • Cost: $13.6 Million
  • Contractor: Castle Rock Construction
  • Timeline: May 2022 - April 2024
  • Location: US 287 and US 50 in Lamar

US 287 Lamar project location map