US 287 & US 50 Resurfacing in Lamar
About the Project:
The Colorado Department of Transportation will begin work to improve a portion of US 287 through Lamar which includes reconstruction of US 287 and a portion of US 50 in Lamar from Park Street to Savage Ave.
Work Schedule
- Monday - Friday, 7 a.m. - 5 p.m.
Traffic Impacts
- Single-lane closures and periodic one-way alternating travel through the work zone.
- Flaggers and temporary traffic signal will direct single-lane, alternating traffic.
- Occasional width restrictions of 11 feet will be in place.
- Occasional Speed reductions will be in place.
Project Facts
- Cost: $13.6 Million
- Contractor: Castle Rock Construction
- Timeline: May 2022 - April 2024
- Location: US 287 and US 50 in Lamar