Public Meeting No. 3
Intro Items
Alternatives
- Alternatives Evaluation Process
- Alternatives Evaluated
- Draft Level 3 Evaluation Matrix
- Level 3 Alternatives: Powers to Constitution (3 Alternatives)
- Level 3 Alternatives: Constitution to Falcon (2 Alternatives)
- Level 3 Alternatives: Falton to Peyton (1 Alternative)
- Level 3 Alternatives: Peyton to Calhan (1 Alternative)
- Level 3 Alternatives: Calhan to Ramah (1 Alternative)
Draft Study Recommendations
- Strip Map by Segment: Powers to Constitution (Six-Lane Alternative)
- Strip Map by Segment: Constitution to Falcon (Six-Lane Alternative)
- Strip Map by Segment: Falcon to Peyton: (Four Lanes—Two with Passing Lanes—Alternative)
- Strip Map by Segment: Peyton to Calhan< (Two Lanes with Passing Lanes—Raised Median—Alternative)
- Strip Map by Segment: Town of Calhan
- Strip Map by Segment: Calhan to Ramah (Two Lanes with New Passing Lanes Alternative)
- Recommended Technology Elements
- Recommended System Management Elements
- Access Control Plan: Recommended Revisions