Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
  5. Re-Evaluation
Resources
  • Projects
  • Assets
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
      • I-25 Colorado Springs Area FONSI
      • Appendices
      • Re-Evaluation
        • COVER PAGE.pdf
        • Final Form 1399.doc
        • Lane_Closure_week_63_Sept_16_to Sept_22_2012_I25 and Santa Fe.pdf
        • Mitigation Matrix.pdf
        • TM 01a Air Quality.pdf
        • TM 01b Air Quality Support Document.pdf
        • TM 02 Water Quality.pdf
        • TM 03 Wildlife.pdf
        • TM 04 North I-25 Wetlands.pdf
        • TM 06 Land Use.pdf
        • TM 07 ROW.pdf
        • TM 08 Transportation.pdf
        • TM 09 Section 4f.pdf
        • TM 10 Noise.pdf
        • TM 11
        • TM 12 SocioEconomic.pdf
        • TM 13 Cummulative.pdf
        • TM 14 NA Consultationnew.pdf
        • TM 15 Archeo.pdf
        • TM 16 Paleontology tech memo.pdf
        • TM 17 Attachement SHPO_COSpringsresponses.pdf
        • TM 17 History.pdf
        • TM 05 TandE.pdf
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • CO 1 Wellington South Resurfacing
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 52 and Weld County Road 37 Intersection Improvements
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • CO 72 Chipseal in Larimer County
  • CO 71 Passing Lane Construction from Limon to Brush
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • Denver Metro Bridge Safety Improvements
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
Re-Evaluation https://codot.gov/projects/studies/i-25-finding-of-no-significant-impact-fonsi/Re-Evaluation https://codot.gov/@@site-logo/siteLogo.png

Re-Evaluation

COVER PAGE.pdf
Final Form 1399.doc
Lane_Closure_week_63_Sept_16_to Sept_22_2012_I25 and Santa Fe.pdf
Mitigation Matrix.pdf
TM 01a Air Quality.pdf
TM 01b Air Quality Support Document.pdf
TM 02 Water Quality.pdf
TM 03 Wildlife.pdf
TM 04 North I-25 Wetlands.pdf
TM 06 Land Use.pdf
TM 07 ROW.pdf
TM 08 Transportation.pdf
TM 09 Section 4f.pdf
TM 10 Noise.pdf
TM 11
TM 12 SocioEconomic.pdf
TM 13 Cummulative.pdf
TM 14 NA Consultationnew.pdf
TM 15 Archeo.pdf
TM 16 Paleontology tech memo.pdf
  • 1
  • 2
  • Next 3 items

Need More Help?

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo