Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Northeastern Colorado
Resources
  • Projects
  • Assets
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 72 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Surface Treatment MP 59 – MP 64
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • CO 64 & CO 13 Meeker Resurfacing
  • CO 64 Bridges west of Meeker
  • CO 114 Overlay, Gunnison to Saguache County
Northeastern Colorado Northeastern Colorado - Region 4 Active Construction https://codot.gov/projects/region-4-active-construction https://codot.gov/@@site-logo/siteLogo.png

Northeastern Colorado

Northeastern Colorado - Region 4 Active Construction
Title
CO 7 Lower (Lyons to Raymond)
CO 14 Cameron Peak Emergency Response Culvert Project
CO 52 Culvert Extension at Weld County Road 19
CO 119 & Sugarloaf Road Retaining Wall Replacement
CO 119 Boulder Canyon Tunnel Repairs
CO 170 Critical Culverts, Boulder County
East Central Colorado ADA Curb Ramps
Eastern Plains Timber Bridge Replacement
Firestone-Longmont Mobility Hub
I-25 Concrete Panel Replacement
I-25 North Johnstown to Fort Collins
I-70 Bridge Maintenance between Limon and Agate
ITS Installation of Road Side Connected Vehicles
Signal Replacement Project in Loveland
State Passenger and Freight Rail Plan
US 36 Lyons to Estes
US 85 and Weld County Road 44 Interchange
US 85 at County Road 14.5 Intersection Improvements
US 287 & CO 52 Intersection Safety Improvements
US 385 Holyoke North Resurfacing
US 385 North of Cheyenne Wells
Weld County ADA Ramps

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo