Northeastern Colorado Studies

Ports to Plains

This study was a joint effort by four state Departments of Transportation (DOTs) including Colorado, Texas, Oklahoma, and New Mexico. It includes I-70 from I-25 east to US 40/287 and then south along US 40/287 to the Colorado/Oklahoma border. The purpose was to create a Development and Management plan for the Ports to Plains Corridor, which outlines a proposed plan for the corridor and serves as an essential tool for securing federal funding for corridor development. It contains several elements that improve the transportation network’s ability to move people and goods. Nearly 1,400 miles long, the corridor consists of 511 miles of 4- to 6-lane roadway, 755 miles of 2-lane roadway, and 113 miles of roadway in metropolitan areas. Keywords: Studies, US Highways, Interstates

SH 402 EA and FONSI

Environmental Assessment (EA) - July 2007 and Finding of No Significant Impact (FONSI) - January 2008- encompasses the 4-mile length of SH 402 although improvements are not needed for the area between SH 287 and CR 13C (St. Louis Avenue), which was widened by developers in coordination with the city of Loveland and the Colorado Department of Transportation (CDOT) under a Categorical Exclusion (CE). Keywords: Studies, State Highways, Studies