Northeastern Colorado Studies

CO 59 Resurfacing from Seibert to Cope

CO 59 from Seibert to Cope - The project consists of overlaying the existing roadway with 2.5 inches of hot mix asphalt and in places patching degraded areas. In addition, various structures will receive rehabilitation work. This will include bridge railing, guardrail, signing, delineators, and striping. This will improve the roadway function and make it safer for traffic. Kit Carson, Washington Counties, Colorado Highway

CO 71 Resurfacing south of Limon

Colorado Highways, CDOT will begin a resurfacing project on a 37-mile stretch of CO 71, south of Limon, between mile points (MP) 63.8 to 100.83.