I-70 Mountain Corridor Projects and Studies
The I-70 Mountain Corridor continues to work towards completing the Preferred Alternatives outlined in the Final Environmental Impact Statement and Record of Decision. To learn more about current projects happening in the corridor and related studies, explore the links below. We recommend looking at our List of Studies and Guidance for the Corridor for a brief description of all Corridor related documents. Additionally, to see the progress CDOT has made to date, take a look at the Corridor’s Preferred Alternative Tracking Sheet. For any questions or concerns please email Vanessa Halladay.
I-70 Mountain Corridor Studies
- List of Studies and Guidance for the Corridor
- I-70 Mountain Corridor Traffic and Revenue Study
- I-70 Mountain Corridor Short Term Mobility Solutions Report
- The Economic Impacts of High-Speed Transit in the I-70 Mountain Corridor
- Advanced Guideway System (AGS) Feasibility Study (2014)
- Design Speed Study
- Interregional Connectivity Study (2014)
I-70 Mountain Corridor Projects
- I-70 Mountain Corridor Preferred Alternative Tracking Sheet
- Westbound Peak Period Shoulder Lane
- Eastbound Peak Period Shoulder Lane
- I-70 Frontage Road Improvement
- Floyd Hill to Veterans Memorial Tunnel
- Twin Tunnels EA