You are here: Home Projects I-70 Bridges over Ward Road Photo Gallery Photo Gallery https://www.codot.gov/projects/i70-ward-road-bridges/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery I-70 Bridges over Ward Road in Their Current Condition Photo CDOT. wide view existing bridges 3 12 23.jpg north view existing bridges 3 12 23.jpg Project sign at RTD lot 3 12 23.jpg wide view existing bridges 3 12 23 (1).jpg north view existing bridges 3 12 23 (1).jpg Project sign at RTD lot 3 12 23 (1).jpg West overhead view of EB bridge prior to demolition Nick Bruce.JPG wide view current bridges from south sidewalk Photo by Presley Fowler.jpg Closeup underside of existing bridges at Ward Road Photo by Presley Fowler.jpg northeast view existing bridges I-70 over Ward Road 3 12 23.jpg Crews removing bridge overhang I-70 over Ward Road Bridge Photo by Anthony Lobato.jpg Closeup view of removed bridge overhang I-70 over Ward Road bridges - Photo Anthony Lobato.jpg Closeup bridge overhang removal during overnight hours May 14 Photo Anthony Lobato.jpg View of removed overhang I-70 over Ward Road with sign bridge in the background.jpg View of demolished overhang and slope paving I-70 over Ward Road bridge structures.jpg Underside view of existing westbound bridge on I-70 over Ward Road.jpg Sign bridge on I-70 at Ward Road.jpg Side view of existing westbound I-70 bridge over Ward Road.jpg Wide view of pier cap construction at I-70 over Ward Road Photo Estate Media.jpg Wide southeast view pier cap constructon I-70 over Ward Road Photo Estate Media.jpg Temporary shoring I-70 over Ward Road bridges Photo Estate Media.jpg Shoring installation on the west side of I-70 over Ward Road Photo Estate Media.jpg Closeup MSE wall construction photo Estate Media.jpg Wide view progress of pier cap constructon and MSE walls Photo Estate Media.jpg MSE wall construction underway at I-70 Ward Road bridges Photo Estate Media.jpg Wide view progress of pier cap constructon and MSE walls Photo Estate Media (1).jpg Wall construction underway for the I-70 over Ward Road bridge replacement. Photo Hiep Pham..jpg MSE wall construction underway at I-70 Ward Road bridges Photo Estate Media (1).jpg MSE wall construction for the I-70 over Ward Road bridge replacement project. Photo Hiep Pham..jpg Closeup MSE wall construction photo Estate Media (1).jpg High view girder erection Aug 10.jpg resized.jpg Girder placement underway on Aug 10. Photo David Evans Assoc.jpg resized.jpg Drone view girder placement underway for I-70 over Ward Road bridges Aerial photography by David Evans and Assoc..jpg resized.jpg Closeup poured pier cap with placed girders I-70 over Ward Rd Photo Estate Media (1).jpg Wide view newly placed girders for bridge at I-70 over Ward Road Photo Estate Media (1).jpg View of new girders for I-70 over Ward Road bridge Photo Estate Media.jpg Underside view of new girder placement and MSE walls at I-70 over Ward Rd. Photo Estate Media.jpg Wide drone view deck pour I70 over Ward Road Photo Afshan Andesha resized.jpg Deck Pour I 70 over Ward Road Aerial photography by Afshan Andesha, David Evans & Assoc. resized.jpg View of new bridge structure I-70 from Ward Rd Photo Estate Media.jpg Ground view new bridge structure I-70 over Ward Rd Photo Estate Media.jpg Closeup underside new bridge structure I-70 Ward Rd Photo Estate Media.jpg Removals underway WB bridge photo Neil Olson.jpg Drone view of westbound I-70 bridge prior to demolition John Klippel.jpg Deck panel removals in process I70 Ward Rd Photo Neil Olson.jpg Aerial view I-70 Ward Bridge traffic shift John Klippel--9.jpg Aerial WB I-70 Ward Rd traffic shift John Klippel.jpg Wide drone view WB I-70 bridge over Ward Rd prior to removal John Klippel.jpg Ground view WB I-70 bridge Ward Rd prior to demolition John Klippel.jpg Drone view of westbound I-70 bridge prior to demolition John Klippel (1).jpg Aerial view I-70 Ward Bridge traffic shift John Klippel--9 (1).jpg Aerial WB I-70 Ward Rd traffic shift John Klippel (1).jpg Wide view westbound bridge demolition Photo Hiep Pham.jpg Demo of WB I-70 bridge Ward Road in progress Photo by Hiep Pham.jpg Close up of demolition process underway WB I-70 bridge over Ward Road Photo Hiep Pham.jpg view of removed I-70 bridge from Ward Road Estate Media.jpg Wide view removed westbound I-70 bridge structure Estate Media.jpg 2 Wide view removed bridge westbound I-70 at Ward Rd Estate Media.jpg Wide view column construction for WB I70 bridge structure Neil Olson.jpg Pier construction underway I-70 Ward WB bridge Neil Olson.jpg Overhead view pier construction I-70 Ward Road Neil Olson.jpg Close overhead view pier construction underway WB I70 Ward Road Neil Olson (1).jpg Wide view westbound I-70 bridge construction underway at Ward Road Estate Media.jpg Wide view piercapconstruction I70 Ward Rd Estate Media.jpg MSE wall construction underway I-70 Ward Road WB bridge Estate Media.jpg Closeup pier cap and MSE wall under construction I-70 Ward Rd Estate Media.jpg Westbound bridge construction underway I-70 Ward Road.jpg Closeup pier cap construction I-70 Ward Road.jpg Crews installing MSE wall panels I-70 over Ward Road bridge.jpg Wide view bridge construction progress I-70 Ward Road.jpg Closeup MSE wall construction for westbound I-70 bridge Ward Road.jpg Wall panel installation for I-70 bridge over Ward Road.jpg NorthviewgirderplacementunderwayI70WardRd AfshanAndesha.jpg ResizedClose drone view girder placement WB I-70 over Ward AfshanAndesha.jpg Closeupgirderset WBI-70Ward AfshanAndesha.jpg Girders being placed WBI70WardRoad AfshanAndesha.jpg Close drone view girder placement WB I-70 over Ward AfshanAndesha.jpg crewssettingdeckpanelswbi70wardrachellegabrielson.jpg crewssettingdeckedgeandoverhangi70wardrachellegabrielson.jpg Crews settingdeckpanelsi70ward rachellegabrielson.jpg Deck PourWB I-70 Ward Feb 15 Neil Olson.jpg Closeup deck pour underway showing rebar Neil Olson.jpg Rebar installation WB I70Ward Road bridge Neil Olson.jpg Overhang work Ward Road bridge Neil Olson.jpg Crews installing overhang and deck edge WB I-70Ward Road bridge Neil Olson.jpg Closeup rebar WB I-70 Ward Road bridge Neil Olson.jpg Crews placing road base WBI70 north side Neil Olson.jpg Closeup barrierforming and pouringWBi70Ward Neil Olson.jpg concretepavingpreparea WBI70 Ward Neil Olson.jpg Crews forming and pouring barrier WBI-70 bridge Neil Olson.jpg ReconcretepavingWBI70NeilOlson.jpg Removed overhang WB I70bridge Ward Neil Olson.jpg FinishingworkWBI70Ward Bridge NeilOlson.jpg ConcretepavingWBI70NeilOlson.jpg Wide_view_WBI70Ward_bridgeEstateMedia.jpg West_viewWBI70BridgeWard_EstateMedia.jpg Finished_edge_WBI70Ward_Bridge EstateMedia.jpg guardrail along WB I-70 Ward Neil Olson.jpg New guardrail WB I-70 Ward.JPG Crews installing guardrail WB I-70 Ward Neil Olson.jpg Removal of eastbound I-70 bridge over Ward Road.jpg Northeast view of demolition underway eastbound I-70 bridge over Ward Road.jpg Eastbound I-70 bridge over Ward Road Demolition Wide View.jpg Removal underway of the demolished eastbound I-70 bridge over Ward Road.jpg Excavation Abutments Eastbound I-70 Bridge over Ward Road.jpg East View Finishing Removal Eastbound I-70 Bridge.jpg Closeup View of Eastbound I-70 Bridge Structure Removed Photo by Neil Olson.jpg Eastbound I-70 Ward Road Wide View Pile Driving.jpg Eastbound I-70 Ward Road Pier Cap Construction.jpg Eastbound I-70 Ward Road Crews Driving Piles.jpg Eastbound I-70 Ward Road Closeup piles New Bridge.jpg Eastbound I-70 Ward Road Wide View Piles Pier Construction.jpg Eastbound I-70 Ward Road Piles for Abutments.jpg Eastbound I-70 Ward Road Closeup East View Pier Cap Construction.jpg
Photo Gallery https://www.codot.gov/projects/i70-ward-road-bridges/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery I-70 Bridges over Ward Road in Their Current Condition Photo CDOT. wide view existing bridges 3 12 23.jpg north view existing bridges 3 12 23.jpg Project sign at RTD lot 3 12 23.jpg wide view existing bridges 3 12 23 (1).jpg north view existing bridges 3 12 23 (1).jpg Project sign at RTD lot 3 12 23 (1).jpg West overhead view of EB bridge prior to demolition Nick Bruce.JPG wide view current bridges from south sidewalk Photo by Presley Fowler.jpg Closeup underside of existing bridges at Ward Road Photo by Presley Fowler.jpg northeast view existing bridges I-70 over Ward Road 3 12 23.jpg Crews removing bridge overhang I-70 over Ward Road Bridge Photo by Anthony Lobato.jpg Closeup view of removed bridge overhang I-70 over Ward Road bridges - Photo Anthony Lobato.jpg Closeup bridge overhang removal during overnight hours May 14 Photo Anthony Lobato.jpg View of removed overhang I-70 over Ward Road with sign bridge in the background.jpg View of demolished overhang and slope paving I-70 over Ward Road bridge structures.jpg Underside view of existing westbound bridge on I-70 over Ward Road.jpg Sign bridge on I-70 at Ward Road.jpg Side view of existing westbound I-70 bridge over Ward Road.jpg Wide view of pier cap construction at I-70 over Ward Road Photo Estate Media.jpg Wide southeast view pier cap constructon I-70 over Ward Road Photo Estate Media.jpg Temporary shoring I-70 over Ward Road bridges Photo Estate Media.jpg Shoring installation on the west side of I-70 over Ward Road Photo Estate Media.jpg Closeup MSE wall construction photo Estate Media.jpg Wide view progress of pier cap constructon and MSE walls Photo Estate Media.jpg MSE wall construction underway at I-70 Ward Road bridges Photo Estate Media.jpg Wide view progress of pier cap constructon and MSE walls Photo Estate Media (1).jpg Wall construction underway for the I-70 over Ward Road bridge replacement. Photo Hiep Pham..jpg MSE wall construction underway at I-70 Ward Road bridges Photo Estate Media (1).jpg MSE wall construction for the I-70 over Ward Road bridge replacement project. Photo Hiep Pham..jpg Closeup MSE wall construction photo Estate Media (1).jpg High view girder erection Aug 10.jpg resized.jpg Girder placement underway on Aug 10. Photo David Evans Assoc.jpg resized.jpg Drone view girder placement underway for I-70 over Ward Road bridges Aerial photography by David Evans and Assoc..jpg resized.jpg Closeup poured pier cap with placed girders I-70 over Ward Rd Photo Estate Media (1).jpg Wide view newly placed girders for bridge at I-70 over Ward Road Photo Estate Media (1).jpg View of new girders for I-70 over Ward Road bridge Photo Estate Media.jpg Underside view of new girder placement and MSE walls at I-70 over Ward Rd. Photo Estate Media.jpg Wide drone view deck pour I70 over Ward Road Photo Afshan Andesha resized.jpg Deck Pour I 70 over Ward Road Aerial photography by Afshan Andesha, David Evans & Assoc. resized.jpg View of new bridge structure I-70 from Ward Rd Photo Estate Media.jpg Ground view new bridge structure I-70 over Ward Rd Photo Estate Media.jpg Closeup underside new bridge structure I-70 Ward Rd Photo Estate Media.jpg Removals underway WB bridge photo Neil Olson.jpg Drone view of westbound I-70 bridge prior to demolition John Klippel.jpg Deck panel removals in process I70 Ward Rd Photo Neil Olson.jpg Aerial view I-70 Ward Bridge traffic shift John Klippel--9.jpg Aerial WB I-70 Ward Rd traffic shift John Klippel.jpg Wide drone view WB I-70 bridge over Ward Rd prior to removal John Klippel.jpg Ground view WB I-70 bridge Ward Rd prior to demolition John Klippel.jpg Drone view of westbound I-70 bridge prior to demolition John Klippel (1).jpg Aerial view I-70 Ward Bridge traffic shift John Klippel--9 (1).jpg Aerial WB I-70 Ward Rd traffic shift John Klippel (1).jpg Wide view westbound bridge demolition Photo Hiep Pham.jpg Demo of WB I-70 bridge Ward Road in progress Photo by Hiep Pham.jpg Close up of demolition process underway WB I-70 bridge over Ward Road Photo Hiep Pham.jpg view of removed I-70 bridge from Ward Road Estate Media.jpg Wide view removed westbound I-70 bridge structure Estate Media.jpg 2 Wide view removed bridge westbound I-70 at Ward Rd Estate Media.jpg Wide view column construction for WB I70 bridge structure Neil Olson.jpg Pier construction underway I-70 Ward WB bridge Neil Olson.jpg Overhead view pier construction I-70 Ward Road Neil Olson.jpg Close overhead view pier construction underway WB I70 Ward Road Neil Olson (1).jpg Wide view westbound I-70 bridge construction underway at Ward Road Estate Media.jpg Wide view piercapconstruction I70 Ward Rd Estate Media.jpg MSE wall construction underway I-70 Ward Road WB bridge Estate Media.jpg Closeup pier cap and MSE wall under construction I-70 Ward Rd Estate Media.jpg Westbound bridge construction underway I-70 Ward Road.jpg Closeup pier cap construction I-70 Ward Road.jpg Crews installing MSE wall panels I-70 over Ward Road bridge.jpg Wide view bridge construction progress I-70 Ward Road.jpg Closeup MSE wall construction for westbound I-70 bridge Ward Road.jpg Wall panel installation for I-70 bridge over Ward Road.jpg NorthviewgirderplacementunderwayI70WardRd AfshanAndesha.jpg ResizedClose drone view girder placement WB I-70 over Ward AfshanAndesha.jpg Closeupgirderset WBI-70Ward AfshanAndesha.jpg Girders being placed WBI70WardRoad AfshanAndesha.jpg Close drone view girder placement WB I-70 over Ward AfshanAndesha.jpg crewssettingdeckpanelswbi70wardrachellegabrielson.jpg crewssettingdeckedgeandoverhangi70wardrachellegabrielson.jpg Crews settingdeckpanelsi70ward rachellegabrielson.jpg Deck PourWB I-70 Ward Feb 15 Neil Olson.jpg Closeup deck pour underway showing rebar Neil Olson.jpg Rebar installation WB I70Ward Road bridge Neil Olson.jpg Overhang work Ward Road bridge Neil Olson.jpg Crews installing overhang and deck edge WB I-70Ward Road bridge Neil Olson.jpg Closeup rebar WB I-70 Ward Road bridge Neil Olson.jpg Crews placing road base WBI70 north side Neil Olson.jpg Closeup barrierforming and pouringWBi70Ward Neil Olson.jpg concretepavingpreparea WBI70 Ward Neil Olson.jpg Crews forming and pouring barrier WBI-70 bridge Neil Olson.jpg ReconcretepavingWBI70NeilOlson.jpg Removed overhang WB I70bridge Ward Neil Olson.jpg FinishingworkWBI70Ward Bridge NeilOlson.jpg ConcretepavingWBI70NeilOlson.jpg Wide_view_WBI70Ward_bridgeEstateMedia.jpg West_viewWBI70BridgeWard_EstateMedia.jpg Finished_edge_WBI70Ward_Bridge EstateMedia.jpg guardrail along WB I-70 Ward Neil Olson.jpg New guardrail WB I-70 Ward.JPG Crews installing guardrail WB I-70 Ward Neil Olson.jpg Removal of eastbound I-70 bridge over Ward Road.jpg Northeast view of demolition underway eastbound I-70 bridge over Ward Road.jpg Eastbound I-70 bridge over Ward Road Demolition Wide View.jpg Removal underway of the demolished eastbound I-70 bridge over Ward Road.jpg Excavation Abutments Eastbound I-70 Bridge over Ward Road.jpg East View Finishing Removal Eastbound I-70 Bridge.jpg Closeup View of Eastbound I-70 Bridge Structure Removed Photo by Neil Olson.jpg Eastbound I-70 Ward Road Wide View Pile Driving.jpg Eastbound I-70 Ward Road Pier Cap Construction.jpg Eastbound I-70 Ward Road Crews Driving Piles.jpg Eastbound I-70 Ward Road Closeup piles New Bridge.jpg Eastbound I-70 Ward Road Wide View Piles Pier Construction.jpg Eastbound I-70 Ward Road Piles for Abutments.jpg Eastbound I-70 Ward Road Closeup East View Pier Cap Construction.jpg