I-25 and Crystal Valley interchange project (Town of Castle Rock)
About the Project:
The Town of Castle Rock in collaboration with the Colorado Department of Transport and Douglas County are construction a new interchange at I-25 and Crystal Valley Parkway including a new bridge over I-25, reconstruction of Frontage Roads and new local road connections on both side of I-25. This top transportation priority will improve safety and mobility in the surrounding community and provide a key regional transportation link from I-25 to southern Castle Rock and Douglas County.
Project Benefits
- Provide new crossing over I-25 reduce distance for east/west travel on Crystal Valley Parkway
- New on- and off-ramps at Crystal Valley Parkway to access I-25
- New roundabout east of I-25 to increase flow of traffic and reduce congestion
- Frontage Road reconstruction to tie-into the new interchange and roundabout
- New bridge over the Railroad to allow for future expansion planned by BNSF.
Work Schedule:
To help reduce impacts on the traveling public during construction, most of this project will be constructed in phases, with work occurring outside of the active travel lanes.
- Work will last from early 2024 through early 2027
- Working hours 6 a.m. through 6 p.m., Monday to Friday
- Some overnight and weekend work is expected
Traffic Impacts:
Motorists and pedestrians can expect the following impacts during the period of construction:
- Lane closures in both directions of Crystal Valley Parkway
- Traffic shifts on Crystal Valley Parkway, Frontage Roads and I-25
- Reduced speeds through the work zone
- Narrowed lanes and reduced shoulders
- Flagging operations will be in place along local roads to safely direct traffic through construction activities
- Full closure of the Front Range (Plum Creek) Trail.
- Signs will be posted to alert motorists to the closures and available detour routes
- Refer to COtrip.org for real-time travel conditions and road closures
Project Facts
- Construction Cost: $120 Million
- Contractor: Kraemer NA
- Timeline: Early 2024 through Early 2027
- Location: I-25 and Crystal Valley Parkway interchange
- Nearest Town/City: South of Castle Rock
- Mile Point(s): MP178.50 to 179.0
- County: Douglas