CO 119 Repairs Between Boulder & Longmont

Project Facts 

  • Cost: $12 million
  • Contractor: Asphalt Specialties
  • Project Area:
    preconstruction map sh 119 boulder east
    Click to enlarge.

From May through October 2016, CDOT repaired Colorado Highway 1198 between Boulder and Longmont. Work included:

  • overlaying the road with 4 inches of asphalt, with sections of both 5-inch mill-and-fill overlay;
  • replacing guardrail and bridge rail;
  • minor bridge rehab work; and
  • replacing signs.