Replacement of Variable Message Signs & Cameras
About the Project:
This project will upgrade Intelligent Transportation Systems (ITS), including overhead Variable Message Signs (VMS) and Closed-Circuit Television (CCTV) from mile point 213.11 to mile point 216.18 in and directly around the Eisenhower Johnson Memorial Tunnel. These tools are used for monitoring traffic flow and incidents, displaying information for travelers, and making the tunnel as efficient and safe as possible
Project Benefits
This project will be upgrading the cameras and signs in the tunnel for traffic operators' use to monitor the safety and health of the traveling public. These devices are used 24/7 to monitor the tunnel and to alert the traveling public of any delays or incidents on this critical route.
Work Schedule:
- Daytime work
- Monday through Friday, 7 a.m. to 5 p.m.
- Overnight Work
- Sunday work hours are 10 p.m. to 6 a.m.
- Monday through Thursday work hours are 9 p.m. to 6 a.m.
Traffic Impacts:
- Daytime work: Motorists can anticipate single-lane closures
- Nighttime work: Motorist can expect an overnight full bore closure
- When a bore is closed, traffic along both directions of I-70 will be stopped at the tunnel entrance while one direction of travel is escorted through the open bore. Traffic stops will last 20 minutes, and delays are expected to be minimal due to the overnight working hours
Work this Week & Lane Closures EJMT Infrastructure project
Project Facts
- Construction Cost: $8.5 million
- Contractor: Sturgeon Electric
- Timeline: July 2023-Summer 2024
- Location: Eisenhower Johnson Memorial Tunnel (I-70 near Loveland Ski Area)
- Nearest Town/City: Silver Plume & Georgetown to the east, Silverthorne & Dillon to the west
- Mile Point(s): I-70 eastbound and westbound MP 213-216
- County(s): Clear Creek and Summit Counties