CO 7 Resurfacing between I-25 & Brighton
About the Project
The Colorado Department of Transportation and Asphalt Specialties, Inc. are restarting milling and paving operations for the CO 7 Resurfacing project from MP 66.92 to MP 77.05 (project boundaries are between I-25 in Thornton and US 85 in Brighton).
The project includes:
- Asphalt patching
- Milling
- Paving
These improvements increase the longevity, smoothness, and safety of the road.
Project Benefits
- An improved road surface with an extended life
- Safer, more durable roads and a better driving experience
Work Schedule
- Work for the upcoming week is scheduled for 8 a.m. to 5 p.m., Monday through Friday
Traffic
- Daytime work (8 a.m. to 5 p.m.) on CO 7 between I-25 and US 85
- Guardrail work
- Traffic delays
- Lane shifts at various locations along CO 7
- Alternating shoulder closures at various locations along CO 7
- Left turn lane shift at the intersection of eastbound CO 7 and Colorado Boulevard
- Shifting shoulders, lanes and turn lanes will be marked with signs and directed by flaggers
- Speed limit reductions (reduced speed limits will be posted with signs)
- Refer to COtrip.org for real-time travel conditions and road closures
Work this Week & Lane Closures
CO 7 Resurfacing I-25 & Brighton
Project Facts
- Construction Cost: $8.9 Million
- Contractor: Asphalt Specialties, Inc.
- Timeline: August 2024 to July 30, 2025
- Location: CO 7 between I-25 and Brighton
- Nearest Town/City: Broomfield
- Mile Point(s): MP 66.92 to 77.05
- County: Adams