CO 151 Emergency Culvert North of Arboles
Project Complete!
This emergency culvert replacement work is expected to begin at Colorado Highway 151 MP 28.15 beginning August 30, with work expected to be completed in late November.
Work will take place on CO 151 at MP 28.1, Monday through Friday, from 7 a.m. to 7 p.m. Crews will work to install two new concrete box culverts, restore the integrity of the roadway, and re-establish proper water drainage in the area. Construction crews will utilize shoulder closures, single lane closures, and temporary signals. This emergency repair work is critical for the traveling public by ensuring safe roadways and proper water drainage systems.
Project Benefits
- Restore the integrity of the roadway
- Re-establish proper water drainage in the area
Project Facts
- Construction Cost: Pending
- Contractor: American West Construction
- Timeline: August through December 2023
- Location: CO 151
- Nearest Town/City: north of Arboles
- Mile Point(s): 28.15 to 28.151
- County: Archuleta