CO 13 Garco Rio Blanco Hill Widening

About the Project:

The Colorado Department of Transportation along with IHC Scott will widen 3.5 miles of roadway located 11 miles northwest of Rifle. New passing lanes will be created from 26’ to 40’, pullouts, and also a new chain up area.  Work will begin May 9.
The location of the project is on CO 13 from Mile Points 12.78 to 16.18. Mobilizing equipment and materials will begin on April 25, with traffic impacts starting on May 9.

This project will be completed in two phases. During the first phase of the project, the team will work on culverts, drainage, embankment and widening of slopes, and the start of the wildlife underpass. The project anticipated winter shutdown will be November 1, 2022 – April 1, 2023 weather depending. Project completion is expected in November 2023.  


Work Schedule

  • Monday-Friday 6 a.m. - 7 p.m., Saturday work may occur if necessary.

Traffic Impacts

  • Wide load restriction (12' or wider) from 6 a.m. - 7 p.m. 
  • Wide loads will be held outside of project limits during this window of time.
  • Traffic will be guided by flaggers with alternating lane closures.
  • The speed limit is reduced to 45 mph through the work zone

Project Facts

  • Cost: $20 Million +
  • Contractor:  IHC Scott
  • Timeline: May 2022 - November 2023
  • Location: on CO 13 between mp 11.32 and MP 16.18 on Garco Rio Blanco Hill 11 miles northwest of Rifle, Garfield County