Archived Project Sites

CO 71 Resurfacing south of Limon

Colorado Highways, CDOT will begin a resurfacing project on a 37-mile stretch of CO 71, south of Limon, between mile points (MP) 63.8 to 100.83.

CO 74 Rockfall Mitigation Project

Colorado Highways, CO 74 west of Morrison (Bear Creek Canyon) Project description this project will provide geo-hazard mitigation along Bear Creek Canyon.Work will occur at Colorado Highway 74, from mile point 16.1 to MP 18. The project goal is to reduce the rockfall risk at the specific location.