Construction Complete
Archived Project Sites
Colorado Highways
Colorado Highways, SHE 016A 043
Keywords: State Highways
Keywords: Colorado Highways, State Highways
Keywords: State Highways
Keywords: State Highways
Interstates
Keywords: State Highways
Keywords: State Highways
Colorado Highways, State Highways
Colorado Highways, State Highways, US Highways
Keywords: Construction Complete
Keywords: State Highway, US Highway
Interstates
Colorado Highways, State Highways
Colorado Highways, CO52 - MP 35.83 // CO66 - MP 50.32 & MP 49.62 Project description The culverts will be rehabilitated using the centrifugally cast concrete pipe (CCCP) method which uses centrifugal force to uniformly line the inside of each pipe with a high strength mortar. During construction at each site, one lane will be closed for the construction crews to work in. The goal of the project is to increase the longevity of each storm water conveyance pipe to prevent failures and erosion of the embankment(s), while ensuring the safety of the travelling public.