Project Background

From Wednesday, Sept. 6, through Oct. 2017, crews installed a concrete culvert beneath Colorado Highway 145 near Telluride. Work took place seven miles north of the roundabout (between mile points 79.9 and 80.1), in Sawpit, Colorado.

Crews also conducted erosion control on the highway embankment before seeding and mulching.

Project Facts

  • Cost:
    $495,861

Project Team

  • Contractor(s):
    Kirkland Construction