Archived Project Sites

CO 69 Overlay from Westcliffe to Hillside

Colorado Highways, Colorado Highway 69 between the towns of Westcliffe and Hillside in Custer County Project description This project entails resurfacing from Westcliffe to Hillside on CO 69 from MP 58.70 to MP 71.58. Resurfacing includes 2 inches of milling and 2 inches of asphalt pavement overlay in town of Wescliffe, MP 58.70 to MP 59.00. For the rest of the project, the resurfacing consists of 2.5 inches of asphalt pavement overlay. Other work includes replacing just under 7,000 linear feet of guardrail, adding/replacing over 150 signs, replacing all delineators, and Class 2 bridge deck repair with waterproofing membrane on two bridges. The project also includes 1/4 mile of restriping/adding bike lanes on SH 96 in Westcliffe, MP 0.0 to MP 0.26.

CO 71 Resurfacing south of Limon

Colorado Highways, CDOT will begin a resurfacing project on a 37-mile stretch of CO 71, south of Limon, between mile points (MP) 63.8 to 100.83.

CO 74 Rockfall Mitigation Project

Colorado Highways, CO 74 west of Morrison (Bear Creek Canyon) Project description this project will provide geo-hazard mitigation along Bear Creek Canyon.Work will occur at Colorado Highway 74, from mile point 16.1 to MP 18. The project goal is to reduce the rockfall risk at the specific location.