Walsenburg Pedestrian/Bicycle Improvements
Project Completed
Project Facts
- Cost: $1.7 million
- Contractor: Walsenburg Sand and Gravel
- Timeline: May 2019 to December 2019
- Locations: I-25 C (Walsen Avenue) between Spruce and Pine; and on US 160 between Olive and Ysidro in Walsenburg
In December 2019, crews completed the upgrade of curb ramps and sidewalks on I-25C and on US 160 in Walsenburg to ensure they complied with the Americans With Disabilities Act (ADA).
Other work included:
- installing permanent traffic-control devices;
- improving pedestrian crossings; and
- modifying a culvert to accommodate a multi-use shared path on Walsen and Pine.
Crews completed work at the following locations:
- Interstate 25C (Walsen Avenue), between Spruce Street (MP 1.9) and Pine Street (MP 2.3)
- US 160 (Seventh Avenue) between Olive Street (MP 304.72) and Ysidro Street (MP 304.85).
Schedule
- No further traffic impacts
Traffic Impacts
- No further traffic impacts