Wadsworth Maintenance from Hampden Avenue to US 6
Pending funding
Project Facts
- Cost: To be determined
- Contractor: To be determined
- Timeline: May to November 2018
- Location: CO 12, 3.7 lane miles of Wadsworth Boulevard. MP 8.5 to 12.28144, from mile points 5.1 to 6.7
About the Project
This project includes significant street maintenance with over 3.7 miles of Wadsworth Boulevard between Hampden Avenue and US 6 in the City of Lakewood. This major thoroughfare has been identified as a priority for repair and rehabilitation.
The scope of work for this project includes:
- Installation and replacement of 81 ADA concrete curb ramps
- Asphalt milling and overlay
- Asphalt patching
- Adjustments of manholes
- Installation of signage
- Re-striping the highway