North Traffic Light - Crews pour a concrete apron around the signal controller cabinet for the north traffic light on Purcell Boulevard at US 50.
The work in both photos signifies the switching of the temporary signals over to the new, permanent signals. With the permanent signals in place, CDOT was able to open up all lanes of traffic to the public in their final configuration.
https://www.codot.gov/projects/archived-project-sites/us50interchange/photo-gallery/us50purcell_northtrafficlight_concretearoundsignalcontrollercabinet.jpg/view
https://www.codot.gov/projects/archived-project-sites/us50interchange/photo-gallery/us50purcell_northtrafficlight_concretearoundsignalcontrollercabinet.jpg/@@download/image/US50Purcell_NorthTrafficLight_ConcreteAroundSignalControllerCabinet.JPG
North Traffic Light - Crews pour a concrete apron around the signal controller cabinet for the north traffic light on Purcell Boulevard at US 50.
The work in both photos signifies the switching of the temporary signals over to the new, permanent signals. With the permanent signals in place, CDOT was able to open up all lanes of traffic to the public in their final configuration.