US 50 Improvements at Sargents

Project completed

Project Facts

  • Cost: $4.4 million
  • Contractor: APC Southern Construction
  • Timeline: May to July 2021
  • Location: US Highway 50 at Sargents in Sagauche County

About the Project

The work includes resurfacing of approximately 10 miles of roadway, that will incorporate deck milling, sealing and repaving at two bridge structures; shouldering; erosion control; guardrail replacement; signing and final striping. The project was contracted to APC Southern Construction, of Golden, for $4.4 million and is expected to be completed in July 2021.