CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
About the Project
The Colorado Department of Transportation and contract partner Work Zone Traffic Control completed the sign replacement project on CO 115 and US Highway 50 January 30. New signs were installed along CO 115 from Mile Point 13.9 to MP 17.3 in Penrose and on US 50 from MP 316.1 to MP 329.8 between Pueblo and Avondale.
Work included the removal of 450 worn out signs, installation of approximately 530 new signs, installation of new sign posts and delineator upgrades. The new signs consist of speed limit, directional, street, mile point, guide, regulatory and warning signs.
The new signs are larger, have better reflectivity at night to help motorists navigate the highway safely and increase visibility of route-finding markers to increase drivers familiarity to the location of access points.
Project Facts
- Cost: $900,000
- Contractor: Work Zone Traffic Control
- Timeline: January 2023 to June 2023
- Location: US 50 from between Pueblo and Avondale (MP 316.10 to 329.80) and CO 115 from MP 13.9 to MP 17.3 in Penrose