US 40 Steamboat Main Street Rehabilitation Project

Project complete

About the Project:

The rehabilitation improvement project will happen over three months on US 40 in Steamboat Springs, Mile Point (MP) 130.5 to 133.5. The project will improve and prolong the life and durability of the roadway. ADA sidewalk accessibility will be improved. Work will primarily include concrete pavement panel replacement, ADA pedestrian ramps, and sidewalk improvements. Work will be done in both the eastbound and westbound directions on US 40, from 3rd Street to 13th Street.


Project Benefits

  • A smooth road or highway has many important benefits, including safety and improved quality for the driving experience
  • A smoother surface also offers safer driving for motorists

Work Schedule:

  • Work will last approximately three months
  • Working hours are from 7 p.m. to 7 a.m., Sunday through Thursday

Traffic Impacts:

Motorists can expect the following impacts during the period of construction:

  • There will be single-lane traffic, eastbound and westbound, which will remain open at all times
  • Refer to COtrip.org for real-time travel conditions and road closures

Project Facts

  • Construction Cost: $2.2 Million
  • Contractor:  KSK, LLC
  • Timeline: April to June 2024
  • Location: US 40 on Main Street in Steamboat Springs from 3rd street to 13th Street
    • Nearest Town/City: Steamboat
    • Mile Point(s): MP 130.5 to MP 133.5.
    • County: Routt