This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.

LOCATIONS:  On and Off-Ramps at the following locations*:

CO 9D, MP: 138.79 and 138.86, Kremmling, Co, Grand County

6th St. and Grand Ave., Park Ave. and 1st St., Park Ave. and 4th St., 6th St. and Eagle Ave., Park Ave. and 2nd St., Park Ave. and 5th St., Park Ave. and Pine St., Park Ave. and 3rd St., and Park Ave.and 7th St. Work is moving Westbound. Park Ave. is the same/ derives from Hwy 40.

US 40A, MP: 211.87 and 214.11, Granby, Co, Grand County

Agate Ave. and Mesa St., Agate Ave. and 3rd St., Agate Ave. and 6th St., Agate Ave. and Zero St., Agate Ave. and 4th St., US HWY 40/Edgewater Dr., Agate Ave. and 2nd St., Agate Ave. and 5th St., US 40 and Bridge Access, and US 40 and Thompson RD. Work is moving Southbound.

US 40A, Mp: 228.72 and 232.85, Winter Park, Co, Grand County

US 40 and Kings Crossing RD. - Telemark Dr., US 40 and Rendezvous Way, US 40 and High Country Dr., US 40 and Cooper Creek Way, US 40 and Rosie’s Way, US 40 and Vasquez RD., US 40 and Miller RD., US 40 and Old Town Dr., US 40 and Drive, and US 40 and Winter Park Dr., work is moving Southbound.

US 40A, MP: 226.60 and 228.43, Fraser, Co, Grand County

US 40 and Park Ave., US 40 and Fraser Ave., US 40 and CR 72 - CR 804, US 40 and Mid Block, US 40 and Eisenhower Dr., US 40 and Johns Dr., US 40 and Eastom Ave., US HWY 40 and Doc Susie Ave., US 40 and Old Victory RD., US 40 and Byers Ave., US 40 and 1st St., Work is moving Southbound.

US 40A, MP: 201.77 and 201.92, Hot Sulphur Springs, Grand County

Byers Ave. and Spring St., Byers Ave. and Maple St., and Byers Ave. and Hemlock St., Work is moving Eastbound.

CO 125A, MP: 53.26 and 53.53, and CO 14B, MP: 34.09, Walden, Co, Jackson County

Main St. and 6th St., Main St. and 5th St., Main St. and 4th St., and Main St. and Van Horn Ave.

*Work is moving Southbound.

Project Facts

  • Cost: $1.7 million
  • Contractor: KSK, LLC
  • Timeline: May - October 2020
  • Location: Various locations on US 40, CO 14 and CO 125 in Grand and Jackson Counties

Proposed Work Schedule

  • Work began Tuesday, May 26, 2020, on 6th Street and Park Avenue in the Town of Kremmling.
  • The general schedule (subject to change) began Tuesday, May 26, 2020, and is expected to be completed Tuesday, June 23, 2020, weather permitting. Contractors are complying with the latest guidelines set by the State of Colorado for work zones during the COVID-19 response.

Traffic Impacts

  • Affected intersections along 6th Street include Grand Avenue and Eagle Avenue, and various intersections along Park Avenue, including Pine Street, and 1st Street through 7th Street.