You are here: Home Projects Archived Project Sites US 287 & CO 52 Intersection Safety Improvements Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/us287-co52-intersection/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews removing mast arms photo Tim Bricker.jpg crews placing temp signals photo tim bricker.jpg construction devices in place at intersection photo tim bricker.jpg Crews removing mast arms photo Tim Bricker (1).jpg Crews moving signal poles at intersection photo tim bricker.jpg Wide view of crews excavating and performing embankment and irrigation work behind barrier at the US 287/CO 52 intersection. temp signals at the intersection 2 10 23.jpg crews erecting barrier 2 10 23.jpg Crews excavating behind barrier for widening 2 10 23.jpg wide view work behind barrier 2 10 23 (2).jpg wide view irrigation pipe work.jpg excavation for irrigation ditch structures Tim Bricker.jpg excavation crews working on irrigation.jpg crews lining new irrigation ditch Tim Bricker.jpg Crews installing irrigation pipe Tim Bricker.jpg crews laying new irrigation pipe Photo Tim Bricker.jpg Widening and irrigation work underway at the intersection photo Tim Bricker.jpg Wide view excavated area for subgrade and paving.jpg Paving widened section at the intersection of US 287 and CO 52 Photo Tim Bricker.jpg Crews working on concrete formwork and rebar at the intersection of CO 287 and CO 52 Photo Tim Bricker.jpg Crews excavating and preparing corner of US 287 CO 52 for concrete pour.jpg Crews installing new signal poles at the US 287 CO 52 Intersection Tim Bricker.jpg Crews forming new sidewalk curb and gutter for the US 287 CO 52 Improvement Project Photo Tim Bricker.jpg Crews drilling caissons for signal poles 287 52 Improvements Tim Bricker.jpg Closeup concrete pour at US 287 CO 52 Intersection Photo by Tim Bricker.jpg Mast arm installation 287 52 intersection 7 14 23 photo Tim Bricker.jpg Crews installing new poles and signals at the US 287 CO 52 Photo Tim Bricker.jpg Closeup crews installing new poles and signals at the US 287 CO 52 intersection photo Tim Bricker.jpg Wide drone view finished intersection US 287 CO 52.jpg Wide drone view finished intersection US 287 CO 52 RSH.jpg Closeup intersection improvements at US 287 CO 52 RSH.jpg 22456_Drone Photo_finished US 287 CO 52 intersection resized.jpg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/us287-co52-intersection/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews removing mast arms photo Tim Bricker.jpg crews placing temp signals photo tim bricker.jpg construction devices in place at intersection photo tim bricker.jpg Crews removing mast arms photo Tim Bricker (1).jpg Crews moving signal poles at intersection photo tim bricker.jpg Wide view of crews excavating and performing embankment and irrigation work behind barrier at the US 287/CO 52 intersection. temp signals at the intersection 2 10 23.jpg crews erecting barrier 2 10 23.jpg Crews excavating behind barrier for widening 2 10 23.jpg wide view work behind barrier 2 10 23 (2).jpg wide view irrigation pipe work.jpg excavation for irrigation ditch structures Tim Bricker.jpg excavation crews working on irrigation.jpg crews lining new irrigation ditch Tim Bricker.jpg Crews installing irrigation pipe Tim Bricker.jpg crews laying new irrigation pipe Photo Tim Bricker.jpg Widening and irrigation work underway at the intersection photo Tim Bricker.jpg Wide view excavated area for subgrade and paving.jpg Paving widened section at the intersection of US 287 and CO 52 Photo Tim Bricker.jpg Crews working on concrete formwork and rebar at the intersection of CO 287 and CO 52 Photo Tim Bricker.jpg Crews excavating and preparing corner of US 287 CO 52 for concrete pour.jpg Crews installing new signal poles at the US 287 CO 52 Intersection Tim Bricker.jpg Crews forming new sidewalk curb and gutter for the US 287 CO 52 Improvement Project Photo Tim Bricker.jpg Crews drilling caissons for signal poles 287 52 Improvements Tim Bricker.jpg Closeup concrete pour at US 287 CO 52 Intersection Photo by Tim Bricker.jpg Mast arm installation 287 52 intersection 7 14 23 photo Tim Bricker.jpg Crews installing new poles and signals at the US 287 CO 52 Photo Tim Bricker.jpg Closeup crews installing new poles and signals at the US 287 CO 52 intersection photo Tim Bricker.jpg Wide drone view finished intersection US 287 CO 52.jpg Wide drone view finished intersection US 287 CO 52 RSH.jpg Closeup intersection improvements at US 287 CO 52 RSH.jpg 22456_Drone Photo_finished US 287 CO 52 intersection resized.jpg