US 285 Englewood Traffic Signal Upgrades

Project Complete!

This project consists of signal system and communication upgrades along US Highway 285 between US 85 and CO 177. The project consists of furnishing and installing traffic signal controller cabinets, traffic signal controllers, conflict monitors, ups, cctv cameras, vehicle detection devices, ethernet switches, radios, and fiber optic cable. The signal system upgrades will improve safety for the traveling public by improving the functionality of the traffic signals.


Project Benefits

  • The signal system upgrades will improve safety for the traveling public by increasing the functionality of the traffic signals and enhancing the flow of traffic.

Project Facts

  • Construction Cost: $1,202,622
  • Contractor: Lighthouse Transportation Group
  • Timeline: February through April 2024
  • Location: US 285 in Englewood between Santa Fe Dr and University Blvd 
    • Nearest Town/City: Englewood
    • Mile Point(s): MP 259.50 to 261.50
    • County: Arapahoe