US 85 Resurfacing from Platteville to Fort Lupton
About the Project:
From spring to summer 2017, crews resurfaced US 85 from Platteville to Fort Lupton (mile points 242.6 to 246.7).
The project accomplished the following:
- improved the quality of this portion of northbound US 85 via asphalt removal and replacement, and installation of new guardrail;
- provided better drivability for motorists;
- eliminated potholes and divots in the road surface; and
- eliminated "faulting" from the deterioration of the old road.
Project Facts
- Cost: $2.8 million
Project Team
- Contractor(s): Aggregate Industries