US 50 Over Blue Mesa

Project completed

Project Overview

Crews on this project resurfaced a 12.1-mile stretch of US 50 along Blue Mesa Reservoir, in Gunnison County between mile points 127 and 139.1.

Project work, completed in November 2017, included:

  • removing surface cracks and imperfections by milling and recycling the existing asphalt surface;
  • resurfacing the pavement with new asphalt;
  • repairing the bridge deck;
  • replacing guardrail; and
  • restriping the highway.