US 40 Steamboat West
Project Facts
- Average Annual Daily Traffic: 11,000
- Timeframe: May 1, 2017 - Aug. 1, 2018
- Total Lane Miles: 9.1
Project Team
- Contractor(s): Flatiron Construction Corp.
From May 2017 through summer 2018, crews on this project improved safety and mobility on US 40 from Steamboat Springs west.
Work included:
- resurfacing from just west of County Road (CR) B9 to Elk River Road;
- intersection and signal work at Elk River Road; and
- drainage, sidewalk and curb ramp upgrades.