US 40 Craig Traffic Signal Replacement
Project Facts
- Cost:
$1.1 million
Project Team
- Contractor: Sturgeon Electric Company, Inc.
From November 2016 to September 2017, crews on this project replaced traffic signal poles and heads, mast arms, detection equipment, pedestrian curb ramps, and traffic signal controllers and cabinets on US 40 in Craig, Colo., in Moffat County.
The project team also installed conduit and signs.