US 34 & US 287 Curb Ramp Upgrades in Loveland
Project complete
Project Overview
Crews on this project replaced 48 curb ramps at 21 locations on US Highway 34 and US 287 across Loveland with ones that comply with the Americans With Disabilities Act (ADA). Crews also added sidewalk tie-ins and landscaped.
This work was part of CDOT's $85 million initiative to upgrade curb ramps statewide.
Project Facts
- Cost: $440,000
- Contractor: Can Do Concrete
- Timeline: May to July 2019
- Locations: 21 locations on US 34 and US 287 in Loveland on the following stretches:
- on US 34 from mile points (MP) 88 to 93.5
- on US 287 from MP 331.5 to 336.5