US 287 Near Berthoud

Project Overview

This project includes work to smooth out the pavement on US 287. This will require:

  • location-specific milling and an overlay to the roadway;
  • overlay to the approach slabs to bridges; and
  • cleaning and adjusting edge drains.

For As-Constructed Plan Set Berthoud Bypass design files, contact the project team.