US 285 Structure over Chalk Creek J-12-B Scour Mitigationhttps://www.codot.gov/projects/archived-project-sites/us-285-structure-over-chalk-creek-j-12-b-scour-mitigationhttps://www.codot.gov/@@site-logo/siteLogo.png
US 285 Structure over Chalk Creek J-12-B Scour Mitigation
Project Facts
Cost: $375,000
From September to October 2016, crews performed scour mitigation work at the outlet of two cell concrete box culverts on US 285 in Nathrop.