Project Facts
- Cost: $359,777
- Contractor: Avery Asphalt
- Timeline: September - October 2019
- Location: From CO 67 to Meadow Park Drive in Divide, CO, Teller County
US 24 ADA Ramps
In September 2019, crews on this project will begin to replace ADA ramps on US 24 in the town of Divide from CO 67 to Meadow Park Dr. This work is expected to improve the safety of pedestrians and motorists in the area.
Specific improvements include:
- minor asphalt and sidewalk repair
- curb and gutter improvements
- erosion control
Traffic Impacts
- Motorists can expect shoulder closures and possible single lane closures during work hours on this project.
- Sidewalk access will be limited and pedestrians will not be able to cross US 24 for a minimum of 24 hours during ADA ramp upgrades at each intersection.
- Pedestrians are encouraged to plan accordingly and determine an alternate method of transportation during ramp upgrades.
Work Schedule
- Regular work hours will take place Monday through Thursday during daylight hours, typically between 8 a.m. and 4 p.m.
- Crews plan to begin asphalt patching at US 24 and CO 67 on September 4 and there will be a full sidewalk closure for a minimum of 24 hours at this intersection beginning September 9.
- Work will then continue eastbound along the south side of US 24 until Meadow Park Drive where work will move westbound along the north side of US 24.