US 160 Wolf Creek Fiber Optic Installation
Project Facts
- Cost:
$3.7 million
Improvement Area
- Wolf Creek Tunnel
From July to September 2016, crews installed fiber optic lines along US 160 from South Fork to the Wolf Creek Tunnel (mile posts 174-191). This work optimized digital controls within the tunnel.
Project work included:
- trench work.
- shoulder work to install conduit and fiber.
- covering the project area with concrete and topping it with asphalt.