Stencil Project in Teller & El Paso Counties

Project completed

About the Project

This project will focus on the removal and replacement of painted roadway symbols at various intersections (on and off ramps), crosswalks and turn pockets (lane reductions).

The project work zones are spread across two counties, El Paso and Teller, with the following highways: CO 21B, US 24A, US 24G, CO 25A, CO 67D, CO105A.

Project Facts

  • Cost: $448,255
  • Contractor: RoadSafe
  • Timeline: late July 2022 to late August 2022
  • Location: Various highways in El Paso and Teller Counties:  CO 21B, US 24A, US 24G, I-25A, CO 67D, CO 105A

Project Locations:

The project work zones include:

  • Woodland Park: CO Highway 67D (MP 76.9 to MP 77.6)
  • Monument: CO Highway 105A (MP 4.88 to MP 9.22)
  • Between Monument & Colorado Springs: CO Highway 21B (MP 151.21 to MP 152.78)
  • Between Calhan & Colorado Springs: US 24G (MP 312 to MP 319.67 and MP 325.80 to MP 349.18)
  • Between Woodland Park & Colorado Springs: US 24A (MP 303.33 to MP 303.53)
  • Colorado Springs: I-25A (MP 137.4 to MP 143)