State Highway System Variable Message Sign Replacement
In 2016, CDOT crews replaced 20-year-old variable message signs (VMS), and upgraded the state's highway system with cameras, weather stations, and Ethernet ITS networks.
Project work was completed during the day, Monday through Friday, through June 2016.
The project:
- Closed existing informational gaps along various corridors for effective incident management and traveler information.
- Supplied CDOT with better traffic management tools and reduce service interruptions.
Project Team
- Project Engineer(s): Alvin Stamp/Cameron Emick
- Contractor(s): Interface Communications, WL Contractors and ADB companies