The Colorado Department of Transportation, in cooperation with W.L. Contractors will begin work replace the traffic signals at two intersections in Weld County – Windsor on SH 392 & SH 257 and in Ault on SH 14 & 1st Ave. This will include the removal and installation of signal poles, mast arms, controller cabinets, fiber infrastructure, cameras and other infrastructure needed for the signalization.  

Project Facts

  • Cost: $1 Million
  • Contractor:  WL Contractors Inc.
  • Timeline: January to July 2021
  • Location: At the intersection of CO 392, CO 257 in Windsor and CO 14 and 1st Avenue in Ault

Proposed Work Schedule

  • Proposed work schedule: January 2021 to July 2021
  • No current construction as of March 9, 2021, awaiting materials.

Traffic Impacts

  • All motorized vehicles should expect some travel impacts throughout the construction of this project.
  • Motorists should be aware of lane closures and lane shifts in the intersections.
  • Motorists are urged to obey speed reductions and watch for construction personnel and equipment in the work zone.