Project Facts
- Cost:
$10 million
Project Team
- Contractor(s): TBD
Crews on this project will be improving numerous intersections, replacing signals, resurfacing the road and upgrading a bridge.
Project benefits include:
- better surface quality.
- upgraded guardrails.
- enhanced safety through striping and signing.
- extended life of the bridge.
- safer crossings for pedestrians.
- upgraded ADA ramps to meet current standards.
While project hours have not yet been determined, work is scheduled to be completed from July 2016 through 2018.