CO 96 Arkansas River to US 50B and CO 47 from US 50B to Pete Jimenez Boulevard

Project Facts
 

  • Cost:
    $10 million

Project Team

  • Contractor(s): TBD

Crews on this project will be improving numerous intersections, replacing signals, resurfacing the road and upgrading a bridge.

Project benefits include:

  • better surface quality.
  • upgraded guardrails.
  • enhanced safety through striping and signing.
  • extended life of the bridge.
  • safer crossings for pedestrians.
  • upgraded ADA ramps to meet current standards.

While project hours have not yet been determined, work is scheduled to be completed from July 2016 through 2018.