I-76 Over Clear Creek Scour Mitigation
Project completed
About the Project
This was a state-funded bridge scour mitigation project in Adams County. Work included removing scour from the piers of twin bridge structures on Interstate 76 over Clear Creek and deflecting river water to the center of the channel under the bridges. Erosion of the soil around a bridge foundation, frequently referred to as bridge scour, which can over time lead to bridge failure. To manage the risk of bridge failure, counter measures were used to mitigate scour effects.
Project Benefits:
- Crews reinforced the pier walls and placing boulders to mitigate erosion under I-76
- Scour mitigation is critical to maintaining structural integrity to bridge piers
Project Facts
- Cost: $1.7 million
- Contractor: Zak Dirt
- Timeline: Spring 2023 to Summer 2023
- Location: I-76 over Clear Creek, between Federal Boulevard (US 287) and Lowell Boulevard in Adams County. The project limits extend from Mile Point 2.5 to 3.0.