I-70 Overlay and Guardrail Repair from Eisenhower Johnson Memorial Tunnel to Georgetown

Project completed

Project Overview

This was a multi-phase project. Information on both is below.


Westbound Guardrail Project

From Sept. 28, 2015, through 2016, CDOT and APC Southern Construction removed and replaced pavement on westbound I-70 from mile points (MP) 218 to 215. This project also included guardrail repair and replacement on 12 miles of I-70 between the Eisenhower/Johnson Memorial Tunnel and Georgetown.

Repaving Project

From May 10 to Nov. 3, 2015, The Colorado Department of Transportation (CDOT) along with APC Southern Construction began a project to repair and repave the 13-mile section of eastbound I-70 from the Eisenhower Johnson Memorial Tunnels (EJMT) to just outside of Georgetown.  The project also included necessary repairs to four bridges, including the US 6/Loveland Pass Bridge, slope and ditch work, and culvert cleaning.