You are here: Home Projects Archived Project Sites I-25/Cimarron Street (US 24) Interchange Design-Build Project Photos Phase 1 Phase 1: March-April 2016 Phase 1: March-April 2016 https://codot.gov/projects/archived-project-sites/i25cimarronDB/photos/phase-1/phase-1-march-april-2016 https://codot.gov/@@site-logo/siteLogo.png Phase 1: March-April 2016 Cimarron Bridge Over Fountain Creek I-25 Bridge (North and South Sides) Concrete Plant I-25 Southbound Off Ramp I-25 Southbound On Ramp I-25 Southbound Stream Work I-25 Southbound Fountain Bridge I-25 Aerials
Phase 1: March-April 2016 https://codot.gov/projects/archived-project-sites/i25cimarronDB/photos/phase-1/phase-1-march-april-2016 https://codot.gov/@@site-logo/siteLogo.png Phase 1: March-April 2016 Cimarron Bridge Over Fountain Creek I-25 Bridge (North and South Sides) Concrete Plant I-25 Southbound Off Ramp I-25 Southbound On Ramp I-25 Southbound Stream Work I-25 Southbound Fountain Bridge I-25 Aerials